Khella Construction

General Contractor in Westhampton Beach, NY

You want one firm accountable for the whole job rather than five trades pointing at each other. Khella has built in Suffolk County since 2006 and files Westhampton Beach work with Incorporated Village of Westhampton Beach Building Department. About an hour and twenty minutes east.

The East End ZIP 11978 Permits: Incorporated Village of Westhampton Beach Building Department

What we build in Westhampton Beach

Cedar-shingled Long Island home built by Khella Construction

Dune Road is governed by coastal erosion rules as well as flood elevation, so what may be built there is a legal question long before it is a design one. Inside the village, architectural review sets the tone instead.

Khella runs the whole job: drawings, permits, our own carpenters, our own subs and one superintendent who answers the phone. Custom homes, additions, renovations, exteriors and commercial fit-out, all under one contract.

Every Westhampton Beach job runs the same way: a free walkthrough, a line-item estimate, permits filed with Incorporated Village of Westhampton Beach Building Department, and one named superintendent who owns the schedule from demolition to punch list. You get their cell phone, not a call centre.

  • Permit filed with Incorporated Village of Westhampton Beach Building Department, and jurisdiction confirmed before drawings
  • A free on-site walkthrough and an itemised, line-item estimate
  • Architect and engineer coordination where the job needs drawings
  • Permit filing and follow-through, including variance applications
  • One named superintendent, reachable directly, for the whole build
  • Written weekly progress updates and a live schedule
  • Punch list closed before final payment, with warranties and paperwork handed over
  • Flood map and elevation certificate pulled at estimate stage for Westhampton Beach parcels
Building in Westhampton Beach

The four things
that decide
a Westhampton Beach job.

Local knowledge is not a marketing line here. Which department reviews your file, what is behind your walls, and where the flood map runs will each change your budget more than any material selection.

Who issues the permit
Incorporated Village of Westhampton Beach Building Department

The village runs its own department and architectural review. Westhampton and Westhampton Dunes outside the village line are Town of Southampton or their own village, which changes everything.

What we are usually working on

Village houses near Main Street, oceanfront and dune-front modern construction, and traditional shingled summer houses in between.

Flood and coastal reality

Oceanfront and Dune Road property sits in V zone with coastal erosion review. The village centre is behind that but still mapped in places.

The local catch

Dune Road construction is governed by coastal erosion hazard rules as well as flood elevation. What you may build there is a legal question long before it is a design one.

Westhampton Beach
questions,
answered.

Who issues building permits in Westhampton Beach?

Incorporated Village of Westhampton Beach Building Department. The village runs its own department and architectural review. Westhampton and Westhampton Dunes outside the village line are Town of Southampton or their own village, which changes everything. We confirm jurisdiction in writing before drawings are produced, because filing with the wrong department is the most expensive administrative mistake on a Long Island job.

Is a Westhampton Beach property likely to be in a flood zone?

Oceanfront and Dune Road property sits in V zone with coastal erosion review. The village centre is behind that but still mapped in places. We pull the flood map, and the elevation certificate where it applies, at estimate stage rather than after the design is finished.

What should I expect from a Westhampton Beach house of this age?

Village houses near Main Street, oceanfront and dune-front modern construction, and traditional shingled summer houses in between. Dune Road is governed by coastal erosion rules as well as flood elevation, so what may be built there is a legal question long before it is a design one. Inside the village, architectural review sets the tone instead.

What trips people up on Westhampton Beach projects?

Dune Road construction is governed by coastal erosion hazard rules as well as flood elevation. What you may build there is a legal question long before it is a design one. It is the sort of thing that never appears in a lump-sum quote and always appears in the schedule.

Do you actually work in Westhampton Beach regularly?

Yes. About an hour and twenty minutes east. We are in Southampton, Riverhead, Bridgehampton and the surrounding area most weeks, so this is a normal run for our crews rather than a favour.

Building in Westhampton Beach?

Tell us what you are planning. We will walk the property, price it line by line, and tell you honestly whether the budget and the scope line up.

Request an estimate (516) 667-5695