Khella Construction

Roofing, Siding & Masonry in Bellmore, NY

The envelope is failing and you want it fixed properly rather than patched again. Khella has built in Nassau County since 2006 and files Bellmore work with Town of Hempstead Building Department. About twelve minutes south-west.

Nassau South Shore ZIP 11710 Permits: Town of Hempstead Building Department

Roofing and siding in Bellmore

Contractor working on a residential roof and siding replacement

Bay wind exposure to the south. Correct nailing pattern and rated cladding.

The envelope that keeps salt air and driven rain out: architectural and standing-seam roofing, cedar and fibre-cement siding, windows, and the masonry that meets the ground.

We correct the ventilation and the flashing while the roof is off, because those are what actually fail, and nobody re-opens a roof to fix them later.

  • Permit filed with Town of Hempstead Building Department, and jurisdiction confirmed before drawings
  • Architectural shingle, standing-seam metal and cedar roofing
  • Cedar, vinyl and fibre-cement siding, installed over a proper rain screen
  • Full flashing replacement — step, kick-out, chimney and valley
  • Ridge and soffit ventilation corrected as part of the re-roof
  • Windows, doors and exterior trim
  • Masonry: stoops, patios, retaining walls and paver drives
  • Flood map and elevation certificate pulled at estimate stage for Bellmore parcels
Roofing & Siding — Bellmore specifics

What the Bellmore
weather does
to an envelope.

Exposure decides specification. Salt, wind and driven rain are not the same in every part of the Island, and a roof detail that lasts thirty years inland can fail in eight on the water.

What the envelope is up against

South Bellmore, particularly the canal streets, is mapped and flooded in Sandy. North Bellmore is clear.

Roofs and cladding around here

Post-war capes and splits north of Sunrise Highway, older and canal-front housing to the south.

What the estimate must allow for

North and South Bellmore are effectively different construction environments. One is conventional suburban work, the other is flood-zone work, and the ZIP code does not tell them apart.

Bellmore
questions,
answered.

How exposed is a Bellmore roof?

Bay wind exposure to the south. Correct nailing pattern and rated cladding.

Do I need a permit to re-roof in Bellmore?

In most cases yes, filed with Town of Hempstead Building Department. Unincorporated Town of Hempstead, covering both North and South Bellmore. The permit queue is long; we file at the start of design, not the end. People are frequently surprised that a like-for-like re-roof still requires a permit.

Cedar, asphalt or standing seam?

South Bellmore, particularly the canal streets, is mapped and flooded in Sandy. North Bellmore is clear. Exposure, budget and, in some Bellmore locations, review requirements narrow the choice. We will quote two options side by side and tell you what each costs over twenty years, not just this month.

How long does a re-roof take?

A straightforward house is two to four days, weather permitting. Siding runs longer, typically two to five weeks depending on size, cladding and how much rot we find once the old material is off.

What do you replace that others skip?

Flashing and ventilation. Step flashing, kick-out flashing, chimney and valley detail, and ridge and soffit ventilation. Those are what actually leak, and nobody re-opens a roof later to correct them.

Roofing & Siding work in Bellmore?

Tell us what you are planning. We will walk the property, price it line by line, and tell you honestly whether the budget and the scope line up.

Request an estimate (516) 667-5695