Town of Hempstead permits for a home addition or dormer
If your house is in Levittown, East Meadow, Wantagh, Bellmore, Merrick, Seaford or any other unincorporated part of the Town of Hempstead, the Town's Department of Buildings reviews your addition. Here is the process as we run it, so the permit never sets your start date.
Who reviews your addition
The Town of Hempstead is the largest township in the country by population, and its Department of Buildings handles every unincorporated hamlet in it. Incorporated villages inside the Town, such as Garden City, Rockville Centre, Freeport and Hempstead Village, run their own building departments with their own rules and timelines. The first thing we confirm is which one your lot answers to.
Any addition, dormer or second story is structural work, and structural work needs a building permit before the first cut.
Work started without a permit is charged at double the Town's permit fee, must still pass every inspection, and surfaces at resale when the buyer's attorney asks for the certificate of occupancy. Filing first is cheaper in every way.
The file the Town
expects, before
it starts the clock.
Applications go in through the Town's online permit portal as PDFs. An application that sits incomplete for 90 days is abandoned, so we assemble the whole file before we submit it.
- A recent survey by a licensed surveyor showing the lot and every existing structure. If it is older than six months, the Town takes a plot plan affidavit with it.
- Plans sealed by a New York State registered architect or professional engineer, with the structural, plumbing and mechanical details and the energy-code compliance report.
- A zoning analysis showing the addition against the setback, height and lot-coverage limits for your district.
- The owner's affidavit and a recent tax bill, which you sign and we file.
- The contractor's credentials: a Nassau County home improvement license (ours is 203867) and proof of workers' compensation and disability insurance, which New York requires before any building permit is issued.
- Separate trade permits for plumbing fixtures, gas appliances and heating or cooling equipment, filed alongside the building permit.
The zoning numbers that decide whether you need a variance
These are the Town's published residence-district limits. An addition that fits inside them is a straight permit. One that does not goes to the Board of Zoning Appeals first, which typically adds two to four months and its own fees, so we design to the limits unless there is a reason not to.
- Height
- 2½ stories and 30 feet
Measured from the crown of the road to the peak, in Residence A, B and C and in the Levittown Planned Residence District.
- Side yards in Levittown (LPRD)
- 5 feet each, 15 feet combined
Elsewhere in Residence B the two side yards must also total 15 feet, with neither side less than half the other.
- Rear yard
- 25 feet for two stories
15 feet for a one-story section in Residence A, B and C; 25 feet in Levittown's LPRD. A rear shed dormer over the existing wall does not move the setback.
- Front yard
- The average of the houses within 200 feet
And never more than 40 feet. Corner lots have their own minimums: 30 feet in Residence A, 25 in B, 20 in C.
- Lot coverage
- about 25% to 35% of the lot
Residence A 25 percent, Residence B 27.5 to 30 percent, Residence C 35 percent. A dormer adds no coverage; a ground-floor extension does.
- Minimum lot
- 6,000 square feet
The standard Levittown lot is 60 by 100 feet, which is exactly the minimum, so coverage is checked carefully on every extension.
Fees, timing
and inspections.
The Town charges an application fee at filing, then a permit fee computed from the estimated construction cost, then trade permits and the certificate of occupancy at the end.
The Town code sets the building permit fee per $1,000 of estimated cost, so on a typical dormer or addition the Town's fees land in the low thousands of dollars. Plumbing fixtures, gas appliances and HVAC units carry their own permit fees, and the certificate of occupancy for a one- or two-family house is a separate fee at the end. Fee schedules change; we confirm the current figures when we file and list every one as its own line in your estimate.
Plan review commonly takes four to twelve weeks, depending on the season and the examiner's queue. During construction the Town inspects at the stages that matter: footings and foundation for an extension, framing, insulation, plumbing rough-in, and the final. Electrical work is inspected by an approved third-party electrical inspection agency. When the final passes, the Town issues the certificate of occupancy, and that is when our last invoice goes out.
Permit
questions,
answered.
Who files the permit, me or the contractor?
We do. The owner signs the affidavit and provides the survey and tax bill; Khella assembles the plans, zoning analysis, insurance certificates and license, files through the Town's portal, and tracks the review. You see every fee as a line in the estimate.
How long does a Town of Hempstead permit take for a dormer?
Plan on four to twelve weeks for plan review once a complete application is in, plus the two to four weeks the architect or engineer needs before that. A variance adds two to four months. We file early enough that the permit never decides your start date.
My survey is twenty years old. Do I need a new one?
The Town accepts an older survey together with a plot plan affidavit when nothing on the lot has changed. If a shed, pool, fence or extension went in since the survey was drawn, a new survey is the safer route and avoids a rejected application.
Does a dormer change my lot coverage?
No. A dormer builds up inside the existing walls, so lot coverage stays the same; only height and the yard setbacks are checked. A ground-floor extension adds coverage, which matters on a standard 60-by-100 Levittown lot.
What if the previous owner added something without a permit?
It comes up at resale, usually when the buyer's attorney asks for the certificate of occupancy. The Town can legalize existing work through an application with current plans and inspections; we handle that filing alongside the new addition when it makes sense to do both at once.